The Bethel Building Project

Our New Facility, Opening : Winter 2008


 

Bethel Community Baptist Church
(Fellowship Baptist)

 

Back To Top of Page

 




OVERVIEW

 

 
  • Our new sanctuary will accommodate: a baptismal tank,  a large worship stage area and room for 250 people to praise our Lord and Savior Jesus Christ!
  • Full audio visual services will be integrated into the facility, including a ‘hard of hearing loop system’ circling the sanctuary.
  • Street level walkway and vehicle drop-off / pick-up entrances are planned in the front of the building off Mills Road .
  • Underground parking.
  • A lighted neighborhood walkway from Mills Road through to Henry Street is planned on the east side of the building. 
  • Bethel Kid Zone (Daycare) for 25 children
  • Bethel Wellspring Counseling Offices
  • A Family Counseling center is also planned within the building.
  • Full handicap accessibility is available throughout the building.
  • Administration offices, reception and washrooms all on the main floor upon entrance.
  • Sunday School classrooms, a lounge area, board room, washrooms and an outside terrace are part of the complex as well.
  • Park and path areas are planned for the south and west sides of the building.
  • For more information contact: The Bethel Care Society, Al Kelly - (email Al Kelly) 

May 2007:  Surveying the property lines

Turning the first sod

Foundation wall begins

July 2007:  Booming in the Cement

Guiding the boom

Saves loading wheelbarrows!

August 2007: Farewell to the old Bethel

A different view of Bethel

Out with the old, on with the new

September 2007:  Footings

Foundations take shape

Where the old building had stood

Alex the Excavator

Our happy work crew!

Imagine underground parking here!

October 2007: Footings and car park

Church elevator shaft

Ground level for care suites

November 2007: Parkade floor coming along

Lower floor closed in and taking shape

Lower floor care suites

December 2007:  Miles and miles of steel

 A heavy load to brace

Pouring concrete in the rain

It all fits together like a puzzle!

Preparing for the next level

Pouring the second floor

January 2008:  2nd floor walls going up

Second (ground floor) takes shape

It's all about teamwork

February 2008:  2nd floor almost done

Framing a window

Up we go!

Pouring the Day Care floor

Guiding the boom

Leveling off

Pouring the second floor

Guiding the boom between walls

Daycare Entrance

Daycare taking shape

Electricians on the sanctuary floor

Rebar in the sanctuary floor!

           June 2008  Car Park Entrance

                      Car Park

                    Front of Building

              July 2008  Side Stairwell

             Internal walls take shape

                     Internal walls

 Sept 2008 View from  day care play area!

                  Roofing at last!

               We've reached the top! 

                       Up we go!

                   Easy does it!

                    Sanctuary roof

         Sanctuary towards Mills Road

 

 

 

 

 

 

Watch For Updates
And More Pictures As They Become Available

We're Saving A Seat For You


Back to Top Of Page